PV Installation Procedure
The illustration below shows how the PV installation is done from start to finish. Not shown is the installation of the generation meter which has to be intstalled and connected within the property and is dependant on where the panels are fitted i.e whether they are fitted to a garage roof as below or the the main roof structure of the property. It will always be installed so that it is easily accessable for the customer to take the electricity readings.
![]() |
![]() |
![]() |
![]() |
| Scaffolding erected to front elevation | Scaffolding erected to side elevation | Electric cable laid ready for connection | Cable prepared and trench filled in |
![]() |
![]() |
![]() |
![]() |
| Roof tiles removed | Panel framework in place and panels put in position | Panels secured in place by framework and clips | Tiles repositioned to panels and installation and connection completed. |