PV Installation Procedure

The illustration below shows how the PV installation is done from start to finish. Not shown is the installation of the generation meter which has to be intstalled and connected within the property and is dependant on where the panels are fitted i.e whether they are fitted to a garage roof as below or the the main roof structure of the property.  It will always be installed so that it is easily accessable for the customer to take the electricity readings.

PV01 PV02 PV04 PV05
Scaffolding erected to front elevation Scaffolding erected to side elevation Electric cable laid ready for connection Cable prepared and trench  filled in
PV07 PV09 PV08 PV10
Roof tiles removed Panel framework in place and panels put in position Panels secured in place by framework and clips Tiles repositioned to panels and installation and connection completed.